A new car park for a commercial site, delivered as a complete groundworks package: excavation, drainage, sub-base, kerbs and edgings, and preparation for the final surface.
The site needed to stay accessible during the works, so the job was planned in phases with safe pedestrian routes, and deliveries were scheduled to avoid wasted journeys and congestion.
Suitable excavated material was reused where the specification allowed, and waste was separated for recycling throughout the job.