A footpath scheme for a local authority, covering excavation, sub-base, kerbs and edgings, drainage improvements and preparation for surfacing.
Working on public routes means safety comes first. The works were planned around agreed pedestrian management, with clear signage and safe diversions while each section was completed.
Materials were ordered accurately and sourced locally where practical, and waste was separated for recycling.