A groundworks package for a main contractor, covering foul and surface water drainage, kerbs and edgings, sub-bases and associated external works.
Delivering the package with one team made it easier to sequence the work, keep the site tidy and hand each area over to the following trades on time.
Careful planning reduced repeat visits and unnecessary journeys, and suitable material was reused on site where the specification allowed.