We built a new waste yard for BMW from the ground up.
The work started with deep drainage and the installation of interceptors so that runoff from the yard is captured and treated before it reaches the drainage network. We then laid a jointed concrete pad to take heavy vehicles and daily use and installed Trief kerbing along the edges to stop vehicles from leaving the yard and protect the surrounding area.
Street lighting was installed for safe working at all hours, and a metal skip pad was added for waste handling.